Tel:Nanhai District Guangdong city Foshan Province Xia Dong Shi losha Industrial Zone No. 5
TEL:0757-81287895
FAX:0757-81287896
E-mali:hyljx1688@163.com
URL:www.fshyl.cn
Contacts:Xiangjinqi
Mobile phone:186-8927-0307 TEL:0757-81287895
Contacts:Xiangjinhong
Mobile phone:188-2349-7401 TEL:0757-81287895
Planetary power mixer is a kind of power mixing and dispersing equipment without dead point. Hybrid machine adopts unique mixing mechanism, under the barrel fixed; power mixer dispersion plate, impeller achieve both revolution and rotation of the planetary motion, its speed can be frequency speed make material as the complex movement, by cutting and kneading strong material, can be fully dispersed and mixed, mixed does not appear dead.
Matters needing attention:
(1)Before the cauldron is raised, the opening valve must be opened first, so that the autoclave is at normal pressure to press the rise button of the cauldron.
(2)When the cauldron falls, do not put the hand or appliance into the body of the kettle, otherwise it will be safe for breakfast.
(3)Every time you start, you should check the oil quantity of the vacuum pump. The oil quantity should be in the range of the oil standard, if the oil amount is too low, the same grade of lubricating oil should be supplemented in time.
(4)In the switch control cabinet, you should be careful when you leave the power supply. Do not contact any connection end and bare wire to avoid shock.
(5)Before vacuum pumping, it is necessary to determine that the material in the cauldron is completely in a wet state so as to prevent the powder from being pumped out in the cauldron, which affects the service life of the vacuum pump.
(6)No metal or hard articles are allowed to enter the cauldron so as not to damage the machine.
(7)Special attention: we should try to avoid working rotating parts (dispersing, stirring and scraping) leaving the body of the stirred tank to avoid accidents.
(8)The high speed dispersion axis avoids the high speed operation of time - load, and should be from slow to fast speed by step by step, not to mention the most high speed. When you stop, you should slow down from fast to slow.
(9)The system pressure of the equipment has been debugged before the factory is out. Please do not adjust the valve of the hydraulic system. Otherwise, the responsibility is self - conceited.
mobile phone: 18823497401 / 18689270307 | mailbox: hyljx1688@163.com | ||
Telephone: 0757-81287895 | address: Nanhai District Guangdong city Foshan Province Xia Dong Shi losha Industrial Zone No. 5 |